Jonah Reyes
Jonah's studio desk: sketchbooks, pencils and a laptop in afternoon light
JR Working from
SE Portland since 2013

Senior product designer · Portland, Oregon

Design that feels like it was always there.

I'm Jonah Reyes. For thirteen years I've shaped calm, careful software for people who work with their hands — co-op bookkeepers, bus riders, clinic nurses — and I measure the work by what gets easier for them.

13 yrs
designing products
41
shipped releases
9
designers mentored

Career

Thirteen years, five chairs

Open a role to see what actually changed while I was there.

Principal Product Designer

Loamworks · Portland, OR

2023 — now

Payments and payouts tooling for agricultural co-ops.

  • Redrew the payout run from 11 screens to 3; support tickets about “where is my money” fell 62% in two quarters.
  • Built the first shared component kit across web and field tablets — 38 components, adopted by all four product squads.
  • Ran a 9-farm diary study in Yakima Valley that killed a planned feature and saved roughly eight months of build.

Senior Product Designer

Meridian Health · remote

2020 — 2023

Clinical intake, scheduling and the patient portal.

  • Rebuilt intake as a 4-step form clinicians could finish between patients; median completion went 14 min → 5 min 20 s.
  • Took the portal to WCAG 2.1 AA — 240 issues closed with the engineering guild, then wrote the checks into CI.
  • Mentored three designers; two now lead their own product areas.

Product Designer

Rove Labs · Portland, OR

2017 — 2020

Regional transit apps for cities of 50k–400k people.

  • Shipped Rove Transit for six agencies; 71% of riders used live arrivals within the first month.
  • Designed the low-bandwidth offline mode after riding every route in Salem with a 3G phone for a week.
  • Set up the studio's first usability lab — bus seats, a phone rig and sandwiches, every second Thursday.

Interface Designer

Studio Kettle · Seattle, WA

2015 — 2017

Client work for food, farming and logistics brands.

  • Led 14 project launches, from a cold-chain dashboard to a bakery's wholesale ordering site.
  • Introduced type-and-spacing specs the devs actually kept, cutting design QA rounds from four to one.

Junior Designer, then freelance

Sunday Market Collective · Eugene, OR

2013 — 2015

Print, signage and the first websites.

  • Hand-set the signage and stall maps for a 90-vendor farmers market, every Saturday for two summers.
  • Learned HTML and CSS building sites for growers who paid in hazelnuts and rhubarb.

Skills

What I bring to a room

Honest numbers. The bottom of this list is where I lean on engineers, and I'd rather say so than pretend otherwise.

  • Interaction & flow design 96%
  • Design systems 92%
  • Product strategy 88%
  • Prototyping (Figma, code) 86%
  • Accessibility 90%
  • User research & field studies 82%
  • Workshop facilitation 78%
  • HTML & CSS 74%

Selected work

Six projects, with the receipts

Harvest Ledger

Product · 2025

Harvest Ledger

Payout runs for 412 co-op farms, redrawn so a bookkeeper can finish one before lunch.

Rove Transit

Mobile · 2019

Rove Transit

A rider app for six small agencies, built for one cold hand and two bars of signal.

Clayware

Design system · 2024

Clayware

Thirty-eight components, one page of rules, and docs people read on purpose.

Northwind Intake

Product · 2022

Northwind Intake

Fourteen pages of clinical intake, down to four steps a nurse can finish standing up.

Sunday Market Pre-Order

Mobile · 2021

Sunday Market Pre-Order

Ninety stalls, one Saturday morning, and a basket you reserve from the bus.

Field Notes Programme

Research · 2026

Field Notes Programme

A research habit nine farms kept for a year — and the feature it talked us out of.

How I work

“Go where the work happens. The barn, the bus shelter, the clinic hallway. Every good decision I've made started with watching someone struggle in a place I wasn't invited to.”

Start in the field

A week of watching beats a month of opinions.

Design the hard state first

Errors, interruptions and bad signal are the real product.

Leave it maintainable

Tokens, docs and a team who no longer needs me.

What colleagues say

The people who were in the room

Four of them, on what it's actually like to build something with me.

The Loamworks co-op office where the payout team works
Jonah went to the farms before he opened Figma. Payout Friday used to take three hours and a lot of apologising; now it takes forty minutes and nobody calls me about it.
Priya Raghunathan VP Product, Loamworks
A clinic hallway beside the nurses' station
He designed for the interruption, not the ideal. Our nurses finish intake standing in a hallway between patients — that's the whole job, and he was the first designer to see it.
Dana Whitfield Director of Clinical Operations, Northwind Care
Screens in a regional transit operations room
Easiest handoff of my career. Every edge case was already drawn — no signal, cancelled route, snow day. We shipped six agencies in one quarter and argued about almost nothing.
Marcus Oyelaran Engineering Lead, Rove Transit
A studio table covered in design sketches
I still hand his old specs to new designers. Jonah writes things down so clearly that the work keeps paying off at a studio he left nine years ago.
Theo Brandt Founder, Studio Kettle

Contact

Tell me what's getting in your users' way.

I take two engagements at a time — usually six to twelve weeks, often with a research week at the front. January 2027 has room.

No forms-for-forms' sake — one paragraph is plenty.

Good software is quiet, and somebody made it that way.

Product · 2025

Harvest Ledger

Principal designer · Loamworks

A co-op office desk covered in payment paperwork
A grower checking a tablet at the edge of a field

The brief

Every Friday, eleven bookkeepers reconciled crop deliveries against prices that moved daily. The old tool showed them a spreadsheet and hoped for the best; a single mistyped weight could underpay a family farm by hundreds of dollars.

What I did

62%

fewer payment support tickets

3h → 40m

to close a weekly payout run

412

farms paid on the new flow

Happy to walk through the messy middle of this one.

Ask about this project

Mobile · 2019

Rove Transit

Product designer · Rove Labs

A city bus pulling into a shelter
A rider holding a phone at a bus shelter

The brief

Six agencies shared one codebase and no design. Riders in Salem and Bend were checking three different websites to learn whether the 11 was coming.

What I did

71%

of riders used live arrivals in month one

4.6★

average store rating across six agencies

−48%

calls to agency dispatch lines

Happy to walk through the messy middle of this one.

Ask about this project

Design system · 2024

Clayware

System lead · Loamworks

Component sketches laid out on paper
Colour swatches arranged on a studio table

The brief

Four squads, four button heights, three date pickers. Nobody was wrong — there was simply no agreement to point at.

What I did

38

components in production

100%

squad adoption in five months

−30%

design-to-ship time on new screens

Happy to walk through the messy middle of this one.

Ask about this project

Product · 2022

Northwind Intake

Senior designer · Meridian Health

A nurse using a tablet in a clinic hallway
A clipboard holding medical intake forms

The brief

Patients answered the same questions on paper, then a clinician retyped them. Both halves of the work were done twice and neither was trusted.

What I did

14m → 5m20s

median intake time

240

accessibility issues closed

+18

point rise in patient-experience score

Happy to walk through the messy middle of this one.

Ask about this project

Mobile · 2021

Sunday Market Pre-Order

Design lead · pro bono

A vendor weighing vegetables at a market stall
A shopper carrying a basket through a market

The brief

Growers were throwing away unsold produce while shoppers arrived at 11am to find the good tomatoes gone. The collective had no budget and 40 vendors over 60.

What I did

90

stalls on the platform

1,400

baskets reserved in season one

−35%

reported end-of-day waste

Happy to walk through the messy middle of this one.

Ask about this project

Research · 2026

Field Notes Programme

Programme design · Loamworks

The inside of a working barn
Two people talking at the edge of an orchard

The brief

Roadmap arguments were being settled by whoever spoke last. We needed evidence that arrived every week, not once a year.

What I did

9

farms, 12 months, 94% response rate

~8 months

of build avoided on one killed feature

41

Monday digests, all still readable

Happy to walk through the messy middle of this one.

Ask about this project